Preparation Is Most Of A Good Rubber Surfacing Job
Rubber surfacing lasts as long as the bond underneath it, and the bond is made on the first day before any rubber is opened. We pressure wash or grind, strip any sealer or paint, degrease, let the surface dry, and repair cracks that are still moving. Hairline cracks are left alone, because the rubber bridges them.
A damp slab is the trap in Nanaimo. A surface that looks dry can still be carrying water from last week's rain, so we test it rather than guess. Rubber poured over a damp or sealed slab lifts, and that is the job we refuse to do quickly.
Two Granules And Two Binders Make Up Every Mix
The mix is made on site from rubber granules and a polyurethane binder, and there are two of each. EPDM granules are virgin rubber, coloured all the way through and stable in sunlight, so they form the visible top layer and give the colour. SBR granules are recycled tire rubber, black and cheaper, so they form the cushion base under a playground or the whole floor of a garage or gym.
The binder is aromatic or aliphatic. Aromatic is fine under dark blends. Aliphatic costs more and does not amber, so it goes under the pale colours that face the sun. The quote names which one you are getting.
Where Nanaimo Rubber Surfacing Works
Rubber surfacing is poured across the city, from the Old City and Harewood to Departure Bay, Hammond Bay, North Nanaimo, Chase River and Cinnabar Valley, and outside it in Lantzville, Nanoose Bay and Parksville to the north and Cedar, Yellow Point and Ladysmith to the south. The whole run is under forty minutes on the Island Highway.
We pour from roughly March into November on this coast, booking each job into a dry forecast because the cure cannot be rained on.
How A Rubber Surfacing Price Is Arrived At
Rubber surfacing is priced by the square foot, and the figure moves with four things: the depth, the granule, the binder and the state of the surface underneath. A half-inch EPDM patio over clean concrete sits near the bottom of the range; a four-inch playground over a new stone base sits near the top. Small jobs carry a minimum because the mixing and the travel are the same for fifty square feet as for five hundred.
In this part of British Columbia decks, patios, steps, driveways and garages commonly land between about $8 and $16 per square foot, and playgrounds run higher. After the free visit you get one page with the product, the depth, the square footage and the total.