Loose-Fill Playground Mulch In Nanaimo Is Mud By November
Rubber surfacing holds its depth in every landing zone regardless of the weather. Wood chips and pea gravel are kicked out from under the swings and the bottom of the slide within a season, and eleven hundred millimetres of rain a year turns what is left into a sodden mat. A daycare in Harewood or a park in North Nanaimo ends up with bare, hard ground exactly where children land.
Rubber surfacing does not migrate. Rain drains through it, the depth under the swings in April is the depth that was poured, and there is nothing to rake, top up or haul away.
Rubber Surfacing Depth Is Set By The Fall It Must Catch
Rubber surfacing for a playground is poured in two layers: a thick base of recycled SBR for the cushion and a coloured EPDM wear layer on top. The height of the highest deck or bar on the equipment decides how thick the base must be, and that figure goes on the quote so the strata or the school board can see it. A toddler area at a Nanaimo daycare and a school climber are two different depths, and they are priced as such.
Thin rubber surfacing under tall equipment is the failure we see most in the trade, and we do not pour it.
Playground Rubber Surfacing In Nanaimo Is Poured Around The Weather
Rubber surfacing needs a dry base, ten degrees and rising and no rain during the cure, so playground jobs on Vancouver Island are booked into the drier months and around a clear forecast. The base under rubber surfacing can be existing concrete, asphalt, old rubber or a compacted stone bed we build. Drainage is checked first, because a playground that puddles under rubber will still puddle.
Most playground rubber surfacing pours take two to four days depending on the size and the pattern, and the space can reopen once the cure is complete.